Office Renovation in Ankara Business Towers: Approvals and Rules

Renovating an office in a business tower is not the same as renovating a standalone building. The tower runs on shared systems, hundreds of people use the same lifts and corridors, and other companies are working on the floors above and below. Whether your office is in a tower in Söğütözü or an office centre on Eskişehir Yolu, the first step is always a conversation with building management.

Why building management asks for approval

Building management is responsible for shared systems and for the comfort of every tenant. Work inside one office can affect fire detection, sprinklers, central HVAC, electrical panels or the façade. Approval is not a formality; it is how the building protects itself and its tenants.

Documents usually requested

Every tower has its own renovation guidelines. Most ask for:

  • A written scope of work
  • A new layout plan and, where needed, ceiling, electrical and mechanical drawings
  • Contractor details and a list of workers
  • A work schedule and working hours
  • In some buildings, insurance or a deposit

For foreign companies it helps to know that these guidelines, and the correspondence with management, are usually in Turkish. We prepare the documents after the site visit and handle the discussion with management, while keeping you informed in English.

Working hours

In most towers, noisy work such as demolition, drilling and cutting cannot be done during office hours; it is moved to evenings, nights or weekends. Quieter work such as painting, assembly and cabling can often be done during the day. When needed, we run shifts around the clock. Which work is done when is agreed with building management.

Deliveries and debris

  • Goods lift time slots
  • Protection of passenger lifts
  • Loading bay and car park access
  • How and when bagged debris leaves the building

If these are not agreed in advance, time is lost waiting for materials.

Work that touches building systems

  • Partitions: a new room may require moving HVAC diffusers, sprinkler heads and smoke detectors.
  • Ceilings: ducts and services above the ceiling must be removed and refitted without damage.
  • Power: additional load is checked against the floor panel’s capacity.
  • Raised floors: cabling and load capacity under the floor are checked.

In most towers, management’s technical team is involved in this work.

Neighbours

Dust travels under doors and noise through the slab. Dust screens at the entrance, protection in shared corridors and noisy work scheduled when neighbours are closed keep both management and neighbours on your side.

Checklist before you start

  1. Ask building management for the renovation guidelines.
  2. Check the alterations and reinstatement clauses in your lease.
  3. Arrange a site visit and put the scope of work in writing.
  4. Get the drawings and schedule approved by management.
  5. Agree working hours and delivery arrangements.

What you can change in a rented office is covered in our guide to renovating a rented office.

We plan office work around your building’s rules. More: Plaza and Corporate Office Renovation.

Free site visit. We work across Ankara and you can write to us in English. Message us on WhatsApp or call +90 542 186 09 06.